Value Engineering & Constructability

×

Error message

  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6526 of /home4/sddeacon/public_html/includes/common.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/sddeacon/public_html/includes/common.inc).
  • Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 571 of /home4/sddeacon/public_html/includes/menu.inc).

We believe that value engineering and constructability are interrelated and we always approach the project with these issues in mind. Our extensive experience will play an integral role as our team assists the architect and design consultants in evaluating design options such as site development, structural systems, building material alternatives, finishes, MEP alternatives and other approaches that will contribute to the maximum utilization of the project budget.

The optimum time to involve us in the project is prior to the start of design development. At this point, design changes can be implemented without increasing costs of the design process. Allowing us to perform a Value Engineering and Constructability Review, as we have for many clients, will help us identify innovative solutions to potentially complex design challenges.